TotalEnergies E&P UK Upstream Operational Information

As required under Regulation (EU) No 1227/2011 on wholesale energy market integrity and transparency (REMIT), this page provides information on the planned maintenance and unplanned unavailability of infrastructure operated by TotalEnergies E&P UK Limited.

Whilst every effort is made to ensure that the information is given in good faith and to the best of our knowledge and belief at the time of posting, no warranty is given as to the accuracy or completeness of that information.

Notification of Planned Unavailability

 

ASEP

Rev

Date Published

Event Date

Expected Duration

Loss of
Volume 
(mcm/d)

Comments

Bacton SEAL 2 08/08/2023  10:53:15 08/08/2023 1 Day 10 Maintenance complete, flows will restart from 17: 00 hrs
Bacton SEAL 1 07/08/2023  10:53:15 08/08/2023 1 Day 10 Delay to start of works. Elgin Franklin production continues to ramp up to normal levels and will not be affected by the maintenance.
Bacton SEAL 0 07/08/2023  08:22:38 08/08/2023 1 Day 10 In order to conduct essential maintenance at Bacton terminal, the NTS exit point will close to deliveries from 10:00am GD 08/08 The NTS exit point is expected to be available again within 6 hours from closure. EOD delivery targets are not expected to be impacted by this.Planned maintenance on Alwyn.
NSMP - SF 12 13/10/2023  07:53:27 14/10/2023 1 Day 1.9 Alwyn ramp up ongoing.
NSMP - SF 11 12/10/2023  04:40:25 13/10/2023 1 Day 1.9 Alwyn ramp up ongoing.
NSMP - SF 10 10/10/2023  09:15:52 12/10/2023 2 Days 2.9 Alwyn restart in progress following ESD testing. Some gas expected to be produced during 11th October but likely to take 48 hours to get to normal production levels.
NSMP - SF 9 09/10/2023  07:03:32 10/10/2023 1 Day 2.9 Rebuilding stock levels.
NSMP - SF 8 08/10/2023  17:06:49 10/10/2023 2 Days 1 Planned maintenance on Alwyn.
NSMP - SF 7 07/10/2023  13:12:03 10/10/2023 3 Days 2.9 Delayed restart, ramp up may take up to 48 hours.
NSMP - SF 6 05/10/2023  14:27:45 08/10/2023 3 Days 2.9 Delayed restart, ramp up may take up to 48 hours.
NSMP - SF 5 04/10/2023  21:31:25 06/10/2023 2 Days 2.9 Delayed restart, ramp up may take up to 48 hours.
NSMP - SF 4 02/10/2023  21:15:06 05/10/2023 3 Days 2.9 Delayed restart, ramp up may take up to 48 hours.
NSMP - SF 3 01/10/2023  21:56:21 03/10/2023 2 Days 2.9 Delayed restart, ramp up may take up to 48 hours.
NSMP - SF 2 13/09/2023  08:42:47 02/10/2023 19 Days 2.9 Delayed restart, ramp up may take up to 48 hours.
NSMP - SF 1 17/08/2023  07:26:43 22/09/2023 36 Days 2.9 Ramp down almost complete for shutdown - current nomination for gas day 17-Aug-2023 is 0.2 MCM/D
NSMP - SF 0 22/06/2023  12:06:24 01/07/2023 4 Days 2.9 Planned maintenance on Alwyn.
Teeside CATS 13 30/06/2023  16:16:24 01/07/2023 1 Day 0 Culzean maintenance complete and rates ramping up to normal levels.
Teeside CATS 12 27/06/2023  11:39:55 01/07/2023 3 Days 1.8 Reduced production from Culzean due to well maintenance. Rates are expected to vary.
Teeside CATS 11 26/06/2023  09:07:15 01/07/2023 4 Days 2.8 Reduced production from Culzean due to well maintenance. Rates are expected to vary.
Teeside CATS 10 26/06/2023  06:39:10 01/07/2023 4 Days 3.3 Reduced production from Culzean due to well maintenance. Rates are expected to vary.
Teeside CATS 9 25/06/2023  21:39:02 01/07/2023 5 Days 2.3 Reduced production from Culzean due to well maintenance. Rates are expected to vary.
Teeside CATS 8 20/06/2023  10:19:56 01/07/2023 10 Days 3.9 Reduced production from Culzean due to well maintenance. Rates are expected to vary.
Teeside CATS 7 19/06/2023  07:21:12 01/07/2023 11 Days 3.2 Reduced production from Culzean due to well maintenance. Rates are expected to vary.
Teeside CATS 6 18/06/2023  06:44:39 01/07/2023 12 Days 5.1 Reduced production from Culzean due to well maintenance. Rates are expected to vary.
Teeside CATS 5 14/06/2023  08:35:20 01/07/2023 16 Days 5.7 Reduced production from Culzean due to well maintenance. Rates are expected to vary. Reduced export levels expected for a few days.
Teeside CATS 4 13/06/2023  20:04:30 01/07/2023 17 Days 6.0 Reduced production from Culzean due to well maintenance. Rates are expected to vary. Reduced export levels expected for a few days.
Teeside CATS 3 13/06/2023  15:44:48 01/07/2023 17 Days 5.7 Reduced production from Culzean due to well maintenance. Rates are expected to vary. Reduced export levels expected for a few days.
Teeside CATS 2 12/06/2023  18:50:15 01/07/2023 18 Days 3.7 Reduced production from Culzean due to well maintenance. Rates are expected to vary.
Teeside CATS 1 12/06/2023  10:15:27 01/07/2023 19 Days 0.2 Reduced production from Culzean due to well maintenance. Rates are expected to vary.
Teeside CATS 0 11/06/2023  20:39:22 01/07/2023 19 Days 1.4 Reduced production from Culzean due to well maintenance. Rates are expected to vary.
Teeside CATS 4 04/06/2023  18:16:12 01/07/2023 27 Days 2.4 Reduced production from Culzean due to well maintenance. Rates are expected to vary.
Teeside CATS 3 04/06/2023  09:52:49 01/07/2023 27 Days 2.9 Reduced production from Culzean due to well maintenance. Rates are expected to vary.
Teeside CATS 2 02/06/2023  21:23:31 01/07/2023 29 Days 1.8 Reduced production from Culzean due to well maintenance. Rates are expected to vary.
Teeside CATS 1 02/06/2023  21:21:35 03/06/2023 1 Day 0 Reduced production from Culzean due to well maintenance. Rates are expected to vary.
Teeside CATS 0 01/06/2023  17:55:02 01/07/2023 30 Days 2.5 Reduced production from Culzean due to well maintenance. Rates are expected to vary.
NSMP - SF 3 27/05/2023  11:21:06 28/05/2023 1 Day 1 Ramp up complete and production close to pre-shutdown levels.
NSMP - SF 2 27/05/2023  08:10:24 28/05/2023 1 Day 2.5 Restart has commenced and ramp up is ongoing.
NSMP - SF 1 27/05/2023  06:28:10 28/05/2023 1 Day 3.5 Planned maintenance at Laggan Tormore. Restart is delayed.
NSMP - SF 0 15/05/2023  14:18:26 27/05/2023 3 Days 3.5 Planned maintenance at Laggan Tormore. Restart planned for the PM of the 26th May.
NSMP - SF 4 09/04/2023  08:02:46 09/04/2023 1 Day 1.1 Reduced Alwyn delivery at NSMP St Fergus.
NSMP - SF 3 08/04/2023  20:19:00 09/04/2023 1 Day 2.1 Reduced Alwyn delivery at NSMP St Fergus.
NSMP - SF 2 08/04/2023  08:34:53 08/04/2023 2 Days 1 Alwyn gas will be delivered at NSMP St Fergus for gas day 08-Apr-2023.
NSMP - SF 1 08/04/2023  08:20:30 08/04/2023 2 Days 1 Alwyn remains online but no Alwyn gas expected to be delivered at NSMP St Fergus during gas day 8th April. Some Alwyn gas will be re-delivered to NSMP Terminal on gas day 9th April.
NSMP - SF 0 07/04/2023  11:00:20 08/04/2023 2 Days 2.8 Alwyn remains online but no Alwyn gas expected to be delivered at NSMP St Fergus during gas day 8th April. Some Alwyn gas will be re-delivered to NSMP Terminal on gas day 9th April.
Teeside CATS 9 28/04/2023  05:42:22 28/04/2023 1 Day 0.0 Production back to normal.
Teeside CATS 8 27/04/2023  06:32:55 28/04/2023 1 Day 7.4 Ramp up taking longer than anticipated.
Teeside CATS 7 26/04/2023  22:02:56 27/04/2023 1 Day 9.8 Ramp up taking longer than anticipated.
Teeside CATS 6 26/04/2023  06:34:36 27/04/2023 1 Day 9.8 Ramp up ongoing, normal rates expected by end of gas-day 26 April.
Teeside CATS 5 25/04/2023  22:08:38 26/04/2023 1 Day 12.7 Gas export restarted and ramp up ongoing, normal rates expected during gas-day 26 April.
Teeside CATS 4 25/04/2023  16:12:08 26/04/2023 1 Day 13.7 Restart process is under way. Issues with export compressor delaying restart, normal rates expected during gas-day 26 April.
Teeside CATS 3 24/04/2023  18:30:05 25/04/2023 1 Day 13.7 Restart process is under way. Normal gas export rates expected by the end of gas-day 25th April.
Teeside CATS 2 23/04/2023  16:03:36 25/04/2023 2 Days 13.7 Culzean planned maintenance. Restart currently unknown.
Teeside CATS 1 14/04/2023  18:23:59 22/04/2023 2 Days 13.7 Culzean planned maintenance, duration reduced. Flows will be ~12.0 MCM/D the two days prior to the shutdown.
Teeside CATS 0 29/03/2023  12:49:25 22/04/2023 1 Day 14.7 Culzean planned maintenance.
NSMP - SF 1 24/03/2023  13:26:05 24/03/2023 1 Day 0.3 Laggan Tormore outage.
NSMP - SF 0 23/03/2023  23:01:07 24/03/2023 1 Day 1.8 Laggan Tormore outage.
NSMP - SF 10 26/04/2023  15:21:16 27/04/2023 1 Day 0.9 Laggan Tormore ramping up - normal rates expect for gas day 27th April.
NSMP - SF 9 25/04/2023  16:10:04 28/04/2023 3 Days 1.8 Planned maintenance at Laggan Tormore - updated end date.
NSMP - SF 8 21/04/2023  07:51:45 29/04/2023 8 Days 1.8 Planned maintenance at Laggan Tormore - updated end date.
NSMP - SF 7 16/04/2023  08:31:26 24/04/2023 8 Days 1.8 Restart of Planned maintenance at Laggan Tormore - end date not currently known.
NSMP - SF 6 13/04/2023  06:02:24 14/04/2023 1 Day 1 Production from Laggan Tormore restarting.
NSMP - SF 5 12/04/2023  20:32:40 17/04/2023 5 Days 2.3 Production from Laggan Tormore restarting. Rates expected to remain below technical capacity for an unknown period.
NSMP - SF 4 10/04/2023  05:55:32 11/04/2023 18 Days 3.3 Production stop at Laggan Tormore for approximately 18 days.
NSMP - SF 3 10/04/2023  05:54:42 10/04/2023 18 Days 1.8 Production stop at Laggan Tormore for approximately 18 days.
NSMP - SF 2 30/03/2023  09:00:48 07/04/2023 18 Days 3.3 Production stop at Laggan Tormore for approximately 18 days. (delay to start)
NSMP - SF 1 21/03/2023  17:09:55 05/04/2023 18 Days 3.3 Production stop at Laggan Tormore for approximately 18 days. (delay to start)
NSMP - SF 0 21/03/2023  18:46:41 03/04/2023 18 Days 3.3 Production stop at Laggan Tormore for approximately 18 days.
NSMP - SF 3 18/03/2023  11:30:22 19/03/2023 1 Day 0.8 Laggan Tormore has restarted, rates ramping, normal delivery expected for gas day 19-Mar-2023.
NSMP - SF 2 18/03/2023  09:01:12 19/03/2023 1 Day 2.2 Laggan Tormore has restarted, rates ramping, normal delivery expected for gas day 19-Mar-2023.
NSMP - SF 1 18/03/2023  08:05:27 19/03/2023 1 Day 3.4 Laggan Tormore has restarted, rates ramping, normal delivery expected for gas day 19-Mar-2023.
NSMP - SF 0 17/03/2023  05:44:23 18/03/2023 1 Day 3.4 Laggan Tormore delivery stopped for pigging.
Bacton SEAL 2 28/04/2023  17:07:24 06/08/2023 3 Days 10 Gas export route unavailable due to planned onshore maintenance at third party terminal.
Bacton SEAL 1 20/02/2023  08:34:23 01/08/2023 4 Days 10 Gas export route unavailable due to planned onshore maintenance at third party terminal.
Bacton SEAL 0 17/02/2023  14:54:47 01/08/2023 4 Days 10 Gas export route unavailable due to planned onshore maintenance at third party terminal.
Bacton SEAL 3 07/08/2023  19:12:37 08/08/2023 1 Day 8 Elgin Franklin has restarted following the planned maintenance and is currently ramping up. Flows from Bacton SEAL will commence at 20:00hrs. Full production expected during gas-day 8th August.
Bacton SEAL 2 06/08/2023  21:18:09 08/08/2023 2 Days 10 Elgin Franklin flows at Bacton SEAL will be zero due to planned terminal maintenance. It will take approx. 24 hours for Elgin Franklin rates to ramp up to normal on completion of the maintenance works.
Bacton SEAL 1 28/04/2023  17:10:56 07/08/2023 4 Days 10 Elgin Franklin flows at Bacton SEAL will be zero due to planned terminal maintenance. It will take approx. 24 hours for Elgin Franklin rates to ramp up to normal on completion of the maintenance works.
Bacton SEAL 0 17/02/2023  15:03:30 01/08/2023 5 Days 10 Elgin Franklin flows at Bacton SEAL will be zero due to planned terminal maintenance. It will take approx. 24-48 hours for Elgin Franklin rates to ramp up to normal on completion of the maintenance works.
Teeside CATS 4 29/01/2023  07:39:23 31/01/2023 2 Days 0.5 Well maintenance on Culzean, expected to last 10 days, production may increase for periods during this maintenance.
Teeside CATS 3 23/01/2023  20:48:51 31/01/2023 7 Days 2.5 Well maintenance on Culzean, expected to last 10 days, production may increase for periods during this maintenance.
Teeside CATS 2 22/01/2023  14:23:02 31/01/2023 8 Days 2.2 Well maintenance on Culzean, expected to last 10 days, production may increase for periods during this maintenance.
Teeside CATS 1 22/01/2023  14:22:27 31/01/2023 9 Days 1.9 Well maintenance on Culzean, expected to last 10 days, production may increase for periods during this maintenance.
Teeside CATS 0 21/01/2023  17:18:41 31/01/2023 ~10 Days 2.8 Well maintenance on Culzean, expected to last 10 days, production may increase for periods during this maintenance.
             

Notification of Unplanned Unavailability

ASEP

Rev

Date Published

Event Date

Expected Duration

Loss of
Volume 
(mcm/d)

Comments

Bacton SEAL 2 19/01/2024  13:06:49 19/01/2024 1 Day 3.0 Elgin Franklin delivery at Bacton SEAL forecast to restart from 1400 today.
Bacton SEAL 1 18/01/2024  21:34:43 19/01/2024 1 Day 6.0 Elgin Franklin restart process under way, gas export not expected until mid morning tomorrow.
Bacton SEAL 0 18/01/2024  05:56:30 19/01/2024 1 Day 6.0 Elgin Franklin gas export has stopped due to a trip, export expected to restart later today. Flows from Bacton SEAL will cease at 0600 hrs. In addition to the below approximately 2.4 MCM/D of Elgin gas was being delivered at the Bacton Perenco terminal.
NSMP - SF 3 16/12/2023  10:40:36 16/12/2023 1 Day 0.7 Laggan Tormore restarted and production returning to normal.
NSMP - SF 2 12/12/2023  15:12:58 16/12/2023 4 Days 2.7 Export from Laggan Tormore stopped, investigation ongoing, restart unknown.
NSMP - SF 1 08/12/2023  16:51:47 13/12/2023 5 Days 2.7 Export from Laggan Tormore stopped, investigation ongoing, restart unknown.
NSMP - SF 0 06/12/2023  08:19:21 10/12/2023 4 Days 2.7 Export from Laggan Tormore stopped, investigation ongoing, restart unknown.
Bacton SEAL 1 11/11/2023  22:03:21 12/11/2023 1 Day 6 Elgin Franklin gas export has restarted flows at Bacton SEAL will restart from 2200.
Bacton SEAL 0 11/11/2023  21:12:54 12/11/2023 1 Day 6 Elgin Franklin gas export has stopped due to a trip on export compressor, export expected to restart later this evening. Flows from Bacton SEAL will cease at 2115 hrs. In addition to the below approximately 2.6 MCM/D of Elgin gas was being delivered at the Bacton Perenco terminal.
Bacton SEAL 5 01/11/2023  07:03:46 02/11/2023 1 Day 0 Gas production field unavailability.
Bacton SEAL 4 31/10/2023  21:58:53 02/11/2023 2 Days 3 Elgin-Franklin ramp up ongoing. Flows will commence at 23:00hrs at Bacton SEAL.
Bacton SEAL 3 31/10/2023  11:21:29 02/11/2023 2 Days 6 Elgin-Franklin gas export has restarted, flows are slowly ramping up. It is not currently known when flows will commence at Bacton SEAL.
Bacton SEAL 2 30/10/2023  14:25:59 02/11/2023 2 Days 6 Elgin-Franklin gas export has stopped. Investigations ongoing but restart is not currently forecast until gas-day 31st October. Flows from Bacton SEAL will cease at 15:00hrs. In addition to the below approximately 3 MCM/D of Elgin gas was being delivered at the Bacton Perenco terminal.
Bacton SEAL 1 30/10/2023  12:03:27 01/11/2023 2 Days 6 Elgin-Franklin gas export has stopped. Investigations ongoing but restart is not currently forecast until gas-day 31st October. Flows from Bacton SEAL will cease at 16:00hrs. In addition to the below approximately 3 MCM/D of Elgin gas was being delivered at the Bacton Perenco terminal.
Bacton SEAL 0 30/10/2023  11:57:40 01/11/2023 2 Days 9 Elgin-Franklin gas export has stopped. Investigations ongoing but restart is not currently forecast until gas-day 31st October. Flows from Bacton SEAL will cease at 16:00hrs. In addition to the below approximately 3 MCM/D of Elgin gas was being delivered at the Bacton Perenco terminal.
Teeside CATS 2 06/09/2023  16:11:25 07/09/2023 1 Day 2.1 Culzean gas export ramped up, nomination increased from 1800, normal delivery expected for gas day 7-Sep-2023.
Teeside CATS 1 06/09/2023  01:16:14 07/09/2023 1 Day 7.6 Culzean gas export has restarted, ramp up ongoing. Full rates expected by gas-day 7th September.
Teeside CATS 0 06/09/2023  01:16:14 07/09/2023 1 Day 5.3 Culzean has tripped. Restart is currently unknown.
Teeside CATS 1 29/08/2023  16:09:49 30/08/2023 1 Day 1.8 Culzean ramp up ongoing to normal rates.
Teeside CATS 0 29/08/2023  06:59:52 30/08/2023 1 Day 1.8 Reduced production from Culzean.
NSMP - SF 2 28/08/2023  07:02:25 28/08/2023 1 Day 0.0 Back to normal production levels.
NSMP - SF 1 27/08/2023  18:59:28 28/08/2023 1 Day 2.1 Laggan Tormore gas export has restarted and ramp up ongoing. Full rates are expected for the beginning of gas-day 28th August.
NSMP - SF 0 27/08/2023  08:02:32 28/08/2023 1 Day 2.4 Laggan Tormore gas export has tripped. Restart is unknown.
Backton SEAL 2 02/08/2023  07:52:23 03/08/2023 1 Day 4.0 Elgin-Franklin production is being restricted by a third party. Rates expect to ramp down over the course of gas day 2nd August with delivery forecast to stop by 0600 on the 3rd for planned maintenance.
Backton SEAL 1 01/08/2023  11:18:15 02/08/2023 1 Day 4.0 Elgin-Franklin production is being restricted by a third party.
Backton SEAL 0 31/07/2023  09:10:18 01/08/2023 1 Day 4.0 Elgin-Franklin production is being restricted by a third party.
Teeside CATS 9 07/06/2023  16:51:16 07/06/2023 1 Day 0 Normal Culzean delivery levels expected from ~1800 today.
Teeside CATS 8 07/06/2023  10:14:05 08/06/2023 1 Day 2.9 Culzean rates ramping back up to normal, stock levels need to be rebuilt before nomination can be increased. Normal delivery expected for gas day 8th June.
Teeside CATS 7 06/06/2023  05:49:25 07/06/2023 1 Day 10.3 Further reduction on Culzean for unplanned maintenance.
Teeside CATS 6 05/06/2023  23:50:04 07/06/2023 2 Days 4.8 Further reduction on Culzean for unplanned maintenance. Potential for further reduction within day.
Teeside CATS 5 05/06/2023  23:48:25 06/06/2023 1 Day 6.6 Further reduction on Culzean for unplanned maintenance. Reduced production from Culzean due to well maintenance. Rates are expected to vary.
NSMP - SF 0 19/05/2023  05:34:53 20/05/2023 ~1 Day 2.0 Alwyn restart process underway following trip.
Bacton SEAL 3 13/05/2023  11:59:50 14/05/2023 1 Day 4.4 Elgin Franklin delivery at Bacton SEAL forecast to start at 1300 at 3.0 MCM/D with rates ramping up to full rates by the end of GD13/05.
Bacton SEAL 2 13/05/2023  09:26:12 14/05/2023 1 Day 7.4 Elgin Franklin gas export has restarted, stock will have to be rebuilt before deliveries at Bacton can recommence. Normal rates expected for gas day 14-May-2023.
Bacton SEAL 1 12/05/2023  12:11:56 13/05/2023 1 Day 7.4 Elgin Franklin gas export has stopped. In addition to the below, approximately 1 MCM/D of Elgin gas was being delivered at the Bacton Perenco terminal. Flows at Bacton SEAL will cease at 17:00hrs onwards. Restart is currently unknown.
Bacton SEAL 0 12/05/2023  11:07:30 13/05/2023 ~1 Day 7.4 Elgin Franklin gas export has stopped. In addition to the below, approximately 1 MCM/D of Elgin gas was being delivered at the Bacton Perenco terminal. Flows at Bacton SEAL will cease at 14:00hrs onwards. Restart is currently unknown.
NSMP - SF 5 18/04/2023  10:43:13 18/04/2023 1 Day 0.3 Reduce Alwyn delivery.
NSMP - SF 4 17/04/2023  23:04:21 19/04/2023 2 Days 0.9 Reduce Alwyn delivery.
NSMP - SF 3 17/04/2023  13:31:14 18/04/2023 1 Day 0.8 Reduce Alwyn delivery.
NSMP - SF 2 17/04/2023  05:52:42 18/04/2023 1 Day 1.5 Reduce Alwyn delivery.
NSMP - SF 1 16/04/2023  23:18:56 18/04/2023 2 Days 2.5 Reduce Alwyn delivery.
NSMP - SF 0 16/04/2023  17:06:39 17/04/2023 ~1 Day 1.8 Reduce Alwyn delivery.
Bacton SEAL 2 13/04/2023  06:04:07 13/04/2023 1 Day 4.5 Elgin Franklin gas export has restarted, delivery at Bacton SEAL expected to restart at 0800 at 3.0 MCM, with a gradual ramp up to previous levels by mid afternoon.
Bacton SEAL 1 13/04/2023  05:58:31 13/04/2023 1 Day 4 Elgin Franklin gas export has restarted, delivery at Bacton SEAL expected to restart at 0800 at 3.0 MCM, with a gradual ramp up to previous levels by mid afternoon.
Bacton SEAL 0 12/04/2023  17:18:51 13/04/2023 ~1 Day 7.5 Elgin Franklin gas export has stopped. Restart process underway. Gas export is forecast for later tonight but stock will need to be rebuilt in SEAL so difficult at this time to say when delivery at Bacton SEAL will recommence. In addition to the below approx 3.0 MCM/D of Elgin gas was being delivered at the Bacton Perenco terminal. Flows from Bacton SEAL will cease at 19:00hrs.
NSMP - SF 0 04/04/2023  09:35:37 04/04/2023 ~1 Day 2.5 Trip at Laggan Tormore - restart process underway, normal export expected for gas day 5th April.
Bacton SEAL 4 02/04/2023  07:01:42 31/03/2023 0 Day 0 Elgin Franklin gas export back to normal production levels.
Bacton SEAL 3 01/04/2023  16:10:36 31/03/2023 1 Day 3.7 Elgin Franklin gas export has restarted and is ramping up. Flows from Bacton SEAL will commence from 20:00hrs onwards. Normal production levels expected by gas-day 2nd April.
Bacton SEAL 2 01/04/2023  09:55:10 31/03/2023 1 Day 7.7 Elgin Franklin gas export remains shut down. Restart is not expected until later in the gas-day.
Bacton SEAL 1 31/03/2023  21:38:04 31/03/2023 1 Day 7.7 Elgin Franklin gas export has stopped. In addition to the below approximately 2 MCM/D of Elgin gas was being delivered at the Bacton Perenco terminal. Flows at Bacton SEAL will cease at 21:00hrs onwards. Restart is not expected until approximately midday gas-day 1st April.
Bacton SEAL 0 31/03/2023  17:29:31 31/03/2023 1 Day 7.7 Elgin Franklin gas export has stopped. In addition to the below approximately 2 MCM/D of Elgin gas was being delivered at the Bacton Perenco terminal. Flows at Bacton SEAL will cease at 23:00hrs onwards. Restart is not expected until approximately midday gas-day 1st April.
NSMP - SF 3 30/03/2023  22:07:01 30/03/2023 1 Day 3.0 Laggan Tormore has restarted, production expected to return to normal levels by gas-day 31st March.
NSMP - SF 2 30/03/2023  06:00:00 30/03/2023 1 Day 3.4 Laggan Tormore has tripped. Restart is unknown.
NSMP - SF 1 30/03/2023  05:58:19 30/03/2023 1 Day 0 Laggan Tormore has tripped. Restart is unknown.
NSMP - SF 0 29/03/2023  20:32:12 30/03/2023 ~1 Day 0 Laggan Tormore has tripped. Restart is unknown.
Teeside CATS 6 26/03/2023  07:31:27 26/03/2023 1 Day 2.9 Culzean has restarted and is ramping up.
Teeside CATS 5 25/03/2023  21:55:40 25/03/2023 1 Day 6.3 Culzean has restarted and is ramping up.
Teeside CATS 4 25/03/2023  21:19:17 25/03/2023 1 Day 9.4 Culzean has restarted and is ramping up.
Teeside CATS 3 25/03/2023  07:02:20 25/03/2023 1 Day 9.4 Culzean has tripped again on restart.
Teeside CATS 2 24/03/2023  23:58:28 24/03/2023 1 Day 8 Culzean restarted and ramping up, normal production levels expected by gas-day 25th March.
Teeside CATS 1 24/03/2023  20:14:04 24/03/2023 1 Day 8 Culzean remains shutdown. Flows at CATS will drop further at 21:00hrs. Restart is currently unknown.
Teeside CATS 0 24/03/2023  17:04:45 24/03/2023 ~1 Day 2.8 Culzean has tripped. Restart is currently unknown.
NSMP - SF 6 09/03/2023  06:31:46 10/03/2023 1 Day 0 Laggan Tormore gas export back to normal levels.
NSMP - SF 5 09/03/2023  10:32:56 10/03/2023 1 Day 0.8 Laggan Tormore gas export has resumed. Ramp up continues.
NSMP - SF 4 09/03/2023  07:41:45 10/03/2023 1 Day 1.4 Laggan Tormore gas export has stopped during ramp up. Investigations ongoing.
NSMP - SF 3 08/03/2023  22:21:30 09/03/2023 1 Day 2.3 Laggan Tormore gas export has restarted. Full rates expected by gas-day 9th March.
NSMP - SF 2 08/03/2023  11:08:53 09/03/2023 1 Day 3.4 Laggan Tormore remains shut down. Investigations ongoing.
NSMP - SF 1 07/03/2023  11:02:55 08/03/2023 1 Day 3.4 Laggan Tormore remains shut down. Investigations ongoing.
NSMP - SF 0 06/03/2023  06:02:54 07/03/2023 ~1 Day 3.4 Laggan Tormore has tripped. Restart is currently unknown.
Teeside CATS 3 10/03/2023  06:30:49 10/03/2023 1 Day 0 Culzean gas export back to normal levels.
Teeside CATS 2 09/03/2023  15:56:02 10/03/2023 1 Day 8.9 Culzean gas export ramp up continues but slower than expected.
Teeside CATS 1 09/03/2023  13:17:10 10/03/2023 1 Day 5.8 Culzean gas export has restarted and ramp up ongoing. Full rates expected by gas-day 10th March.
Teeside CATS 0 09/03/2023  05:17:03 10/03/2023 ~1 Day 5.8 Culzean gas export has stopped. Restart is currently unknown.
Bacton SEAL 1 08/03/2023  18:56:14 09/03/2023 1 Day 3.3 Elgin Franklin Gas export has restarted. Flows from Bacton SEAL will commence at 20:00hrs with full rates expected by gas-day 9th March.
Bacton SEAL 0 07/03/2023  16:26:10 08/03/2023 ~1 Day 7.3 Elgin Franklin Gas export has stopped. In addition to the below approx 2.7 MCM/D of Elgin gas was being delivered at the Bacton Perenco terminal. Flows from Bacton SEAL will cease at 20:00hrs.
Teeside CATS 2 25/02/2023  16:01:40 26/02/2023 1 Day 5.5 Culzean gas export has restarted. Ramp up will continue over this gas day with normal rates expected for gas day 26-Feb-2023.
Teeside CATS 1 24/02/2023  16:01:40 25/02/2023 1 Day 15.2 Culzean gas export has stopped at the request of the CATs terminal. Restart is expected later this gas day with rates ramping up to normal for gas day 25-Feb-2023.
Teeside CATS 0 24/02/2023  04:56:53 24/02/2023 ~1 Day 15.2 Culzean gas export has stopped at the request of the CATs terminal. Restart time unknown.
Bacton SEAL 10 03/02/2023  05:57:48 04/02/2023 1 Day 1.5 Elgin Franklin - offshore rates have almost ramped back up to normal levels. Flows at Bacton SEAL are close to 6.0 MCM/D at 0600 on the 3rd February and will continue to ramp up over the course of gas day 03-Feb-2023.
Bacton SEAL 9 02/02/2023  15:15:19 03/02/2023 1 Day 3.1 Elgin Franklin - restart of the production that has been offline is underway, flows at Bacton SEAL will reduce from current levels and then ramp up to technical capacity during gas day 03-Feb-2023.
Bacton SEAL 8 02/02/2023  15:13:45 03/02/2023 1 Day 3.1 Elgin Franklin - restart of the production that has been offline is underway, flows at Bacton SEAL will reduce from current levels and then ramp up to technical capacity during gas day 03-Feb-2022.
Bacton SEAL 7 01/02/2023  14:48:52 02/02/2023 1 Day 3.1 Elgin Franklin flows at Bacton SEAL to remain around it's current level. It's not currently known when export levels will increase.
Bacton SEAL 6 30/01/2023  14:33:56 01/02/2023 2 Day 3.1 Elgin Franklin flows at Bacton SEAL to remain around it's current level. It's not currently known when export levels will increase.
Bacton SEAL 5 27/01/2023  19:46:41 30/01/2023 3 Day 3.5 Elgin Franklin flows at Bacton SEAL to remain around it's current level over the weekend. Flows should increase by around 0.5 MCM/D tomorrow as another well is brought on.
Bacton SEAL 4 27/01/2023  11:18:15 28/01/2023 1 Day 1.2 Elgin Franklin export is being reduced to carry out essential maintenance. Export is expected to ramp up again late this afternoon. Delivery from Bacton SEAL is forecast to reduce to around 5.0 MCM/D this afternoon. This maintenance will delay the return to Technical Capacity until the end of the gas day.
Bacton SEAL 3 26/01/2023  10:13:33 27/01/2023 1 Day 1.2 Elgin Franklin export has returned to normal levels, Bacton SEAL flows continue to ramp and should be at Technical Capacity early evening.
Bacton SEAL 2 26/01/2023  20:47:44 27/01/2023 1 Day 4.0 Bacton SEAL delivery for Elgin Franklin due to start at 2100, normal delivery rates not expected until gas day 27th January.
Bacton SEAL 1 26/01/2023  17:21:45 27/01/2023 1 Day 7.5 Elgin Franklin restart process underway, gas export from Elgin not expected until later this evening, stock needs to be rebuilt before redelivery at Bacton SEAL. It's not expected that delivery rates will be back to technical capacity till within day 27th January.
Bacton SEAL 0 26/01/2023  02:13:14 27/01/2023 ~1 Day 7.5 Elgin Franklin Gas export has stopped. In addition to the below approx 2.5 MCM/D of Elgin gas was being delivered at the Bacton Perenco terminal.
Teeside CATS 4 13/01/2023  18:52:03 14/01/2023 1 Day 5.2 Culzean export levels back to normal, stock levels need to be rebuilt. Nomination of technical capacity from 14th January.
Teeside CATS 3 13/01/2023  10:28:07 14/01/2023 1 Day 8.3 Culzean has restarted, export rates increasing, stock levels need to be rebuilt. Expectation of normal delivery for gas day 14th January.
Teeside CATS 2 13/01/2023  06:06:19 13/01/2023 1 Day 8.3 Culzean has tripped. Restart currently unknown.
Teeside CATS 1 12/01/2023  22:53:11 13/01/2023 1 Day 10.2 Culzean has tripped. Restart currently unknown.
Teeside CATS 0 12/01/2023  19:41:49 13/01/2023 ~1 Day 7.7 Culzean has tripped. Restart currently unknown.
Bacton SEAL 1 03/01/2023  10:30:25 01/01/2023 1 Day 5.5 Elgin-Franklin's gas export has restarted. Flows at Bacton SEAL will begin at 13:00hrs and ramp up over the rest of the gas-day.
Bacton SEAL 0 01/01/2023  18:28:50 01/01/2023 ~1 Day 10 Elgin-Franklin has tripped and will remain shut down while investigations are carried out. Flows at Bacton SEAL will cease at 21:00hrs.
             

 

 

Historic Information

2023 Upstream operational information

2022 Upstream operational information

2021 Upstream operational information

2020 Upstream operational information

2019 Upstream operational information

2018 Upstream operational information

2017 Upstream operational information

2016 Upstream operational information